Sod Calculator

Calculate how many sod rolls and pallets you need, plus installation cost, topsoil prep, and sod vs seed cost comparison.

ft
ft
%
Area (sq ft)
—
Sod Rolls Needed (2×5 ft) —
Pallets Needed (500 sq ft) —
Extended More scenarios, charts & detailed breakdown ▾
ft
ft
%
Area (sq ft)
—
Sod Rolls —
Pallets —
Professional Full parameters & maximum detail ▾
sq ft
in
$
$
hrs
$

Soil Prep

Topsoil Needed —
Starter Fertilizer Bags (50lb) —

Sod vs Seed Cost

Sod Material Cost —
Seed Option Cost —

Labor & Total

Estimated Labor Hours —
Labor Cost —
Total Project Cost —

Care Guide

Watering Schedule —

How to Use This Calculator

  1. Enter the length and width of your lawn area in feet.
  2. Set a waste factor (5% for simple shapes, 8–10% for irregular areas).
  3. View sod rolls (2×5 ft standard) and pallets needed.
  4. Use the Irregular Area tab to combine multiple sections.
  5. Use the Cost Estimate tab to budget material and labor.
  6. The Professional tier adds topsoil prep volume, fertilizer, labor hours, and sod vs seed cost comparison.

Formula

Area (sq ft) = Length × Width × (1 + Waste%/100)

Sod Rolls = ⌈Area ÷ 10⌉ (standard 2×5 ft roll)

Pallets = Area ÷ 500 sq ft

Example

Example: 40 ft × 25 ft lawn with 5% waste = 1,050 sq ft → 105 rolls → 2.1 pallets. At $0.55/sq ft + $0.50/sq ft labor = $1,102 total cost.

Frequently Asked Questions

  • A standard sod roll is 2 feet wide × 5 feet long = 10 square feet. Some rolls come in 16"×24" pieces (2.67 sq ft). Always confirm your supplier's roll size.
  • A standard pallet covers approximately 450–500 square feet. This calculator uses 500 sq ft per pallet as the standard.
  • Yes. Add 5% for simple rectangular areas, 8–10% for irregular shapes, and up to 15% for areas with many curves and obstacles.
  • Sod provides instant turf and prevents erosion immediately. Seed is much cheaper ($0.05–$0.15/sq ft vs $0.35–$0.80/sq ft for sod) but takes 3–8 weeks to germinate and establish.
  • Till 4–6 inches of soil, add topsoil if needed, apply starter fertilizer, level and grade away from structures, then lay sod immediately. Water within 30 minutes of installation.

Related Calculators